On-site Productivity Issues
In recent years, productivity in the UK’s construction sector has plummeted. Although the latest ONS data shows a minor increase in productivity at the end of 2017, the Government is still desperate for the construction sector to increase its output - claiming that increasing productivity and build numbers could add up to £15 billion to the UK economy each year.
A number of manufacturers that operate in the construction supply chain, such as Polypipe Terrain, have been harnessing the benefits of factory manufacturing and offsite construction as a solution to decreasing productivity.
One of the easiest ways to speed up on-site builds is to keep things simple. Using fabricated drainage stacks which arrive on site complete and ready to install is one way to speed up proceedings. This helps contractors to get things moving more quickly, with an accurate, efficient installation process.
Additionally, the choice of materials can have a huge impact on productivity. When compared to alternative materials, plastic drainage pipes can negate the need for skilled labourers and allow the project to be completed much more quickly. Not only will this allow contractors to focus elsewhere, but it will also help budgets work harder.
Find out more about fabricated drainage stacks from Polypipe Terrain.
[edit] Related articles on Designing Buildings Wiki
- Advanced construction technology.
- BRE Üserhuus
- British post-war mass housing.
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- Fabricated drainage stacks.
- Flying factory.
- In situ.
- Kit house.
- Modern methods of construction.
- Modular buildings.
- Offsite manufacturing.
- Off site materials.
- Off-site construction.
- Off-site prefabrication of buildings: A guide to connection choices.
- On site.
- Prefabrication.
- Prefabricated structural panels.
- Ronan Point.
- Secondary Ventilation Stacks in Tall Buildings.
- Y:Cube development in Mitcham.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government launches a one stop shop for flood preparedness.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.

















